Punch list

The list of small unfinished or defective items left after the main work is done, walked with the homeowner before final payment. Clearing it in writing protects the contractor, because a signed punch list is what turns a job into a completed one.

More estimating & workflow terms

  • Production orders

    The internal document that releases approved restoration work to the crew or subcontractor, listing materials, quantities, and scheduled dates. It should match the approved scope exactly, because a production order that adds or drops items creates a change the carrier never approved.

  • Psychrometry

    The study of moisture in air: temperature, relative humidity, dew point, and how they interact. Restoration crews use those readings to set drying goals and prove a structure is dry, and the same readings are the evidence a carrier reviews when paying for drying equipment.

  • Reinspection

    A second visit to document damage missed in the first inspection, often needed before a supplement is approved.

  • Restoration project manager

    The person who runs the job day to day: scheduling crews, ordering materials, tracking the scope, and reporting to the homeowner and adjuster. In a claim, that person owns the documentation trail, so moisture readings, photos, and change orders should all route through them.

  • Roof decking

    The structural surface the roof covering is attached to, usually plywood or oriented strand board. It sits above the rafters and below the underlayment and shingles. When decking is soaked or delaminated it is often replaced in sections, and that work is a separate line item from the shingle repair.

  • Roof pitch

    The steepness of a roof, expressed as a rise over run (e.g. 4/12 = 4 inches of rise per 12 inches of run). Pitch affects the installation method, safety, and steep/high charges.

Common questions

What does "Punch list" mean in Xactimate estimating?

The list of small unfinished or defective items left after the main work is done, walked with the homeowner before final payment. Clearing it in writing protects the contractor, because a signed punch list is what turns a job into a completed one.

Where does "Punch list" show up in a claim?

The term matters on estimates and scopes across the insurance restoration workflow. Browse the glossary for related terms.

Put this to work

ESXPress converts carrier scope PDFs into import-ready Xactimate ESX files, line items mapped to their real code, priced for import.

Start free, 5 conversions, no card →