Roof pitch
The steepness of a roof, expressed as a rise over run (e.g. 4/12 = 4 inches of rise per 12 inches of run). Pitch affects the installation method, safety, and steep/high charges.
More estimating & workflow terms
More estimating & workflow terms from the Xactimate glossary, each with the definition an estimator needs when a claim line names it.
- Restoration project manager
The person who runs the job day to day: scheduling crews, ordering materials, tracking the scope, and reporting to the homeowner and adjuster. In a claim, that person owns the documentation trail, so moisture readings, photos, and change orders should all route through them.
- Roof decking
The structural surface the roof covering is attached to, usually plywood or oriented strand board. It sits above the rafters and below the underlayment and shingles. When decking is soaked or delaminated it is often replaced in sections, and that work is a separate line item from the shingle repair.
- Satellite measurement
A roof measurement report built from aerial imagery instead of a site visit, giving dimensions, pitch, and facet areas. It is fast and accurate on simple roofs, and it can drift on complex geometry or heavy tree cover. Have a dispute over measurements checked in the field.
- Scope agreement
A written document confirming exactly what work was authorized and at what price, separate from the insurance estimate. It protects both sides when the carrier's approved scope and the contractor's work order differ. Sign it before starting, not after.
- Scope creep
Work that grows beyond the approved estimate without a written change order or carrier approval. It is how contractors end up doing extra work they never get paid for. Every addition needs documentation and a signature before the work happens.
- Scope of work
The detailed list of repairs and materials needed to restore the property, written either by the insurer's estimator or as the contractor's proposal. A thin scope of work means supplements later, which slows payment. Missing items are the most common source of dispute.
Common questions
What does "Roof pitch" mean in Xactimate estimating?
Xactimate estimating defines Roof pitch this way: The steepness of a roof, expressed as a rise over run (e.g. 4/12 = 4 inches of rise per 12 inches of run). Pitch affects the installation method, safety, and steep/high charges.
Where does "Roof pitch" show up in a claim?
The term matters on estimates and scopes across the insurance restoration workflow. Browse the glossary for related terms.