Estimating & Workflow
Psychrometry
The study of moisture in air: temperature, relative humidity, dew point, and how they interact. Restoration crews use those readings to set drying goals and prove a structure is dry, and the same readings are the evidence a carrier reviews when paying for drying equipment.
More estimating & workflow terms
- Pack-out
Removing contents from a damaged home so they can be cleaned, stored, or inventoried while repairs happen. Pack-outs are billed by the item or by the hour, and carriers expect an inventory with quantities and condition, because undocumented contents are the easiest part of a claim to cut.
- Production orders
The internal document that releases approved restoration work to the crew or subcontractor, listing materials, quantities, and scheduled dates. It should match the approved scope exactly, because a production order that adds or drops items creates a change the carrier never approved.
- Punch list
The list of small unfinished or defective items left after the main work is done, walked with the homeowner before final payment. Clearing it in writing protects the contractor, because a signed punch list is what turns a job into a completed one.
- Reinspection
A second visit to document damage missed in the first inspection, often needed before a supplement is approved.
- Restoration project manager
The person who runs the job day to day: scheduling crews, ordering materials, tracking the scope, and reporting to the homeowner and adjuster. In a claim, that person owns the documentation trail, so moisture readings, photos, and change orders should all route through them.
- Roof decking
The structural surface the roof covering is attached to, usually plywood or oriented strand board. It sits above the rafters and below the underlayment and shingles. When decking is soaked or delaminated it is often replaced in sections, and that work is a separate line item from the shingle repair.
Common questions
What does "Psychrometry" mean in Xactimate estimating?
The study of moisture in air: temperature, relative humidity, dew point, and how they interact. Restoration crews use those readings to set drying goals and prove a structure is dry, and the same readings are the evidence a carrier reviews when paying for drying equipment.
Where does "Psychrometry" show up in a claim?
The term matters on estimates and scopes across the insurance restoration workflow. Browse the glossary for related terms.
Put this to work
ESXPress converts carrier scope PDFs into import-ready Xactimate ESX files, line items mapped to their real code, priced for import.
Start free, 5 conversions, no card →