Estimating & Workflow
F9 notes
Notes attached to a line item in Xactimate: F9 opens the notes field. They document why an item is included, which is often the difference between an approved item and a denied one.
Full guide: f9 notes xactimate supplements guide
More estimating & workflow terms
More estimating & workflow terms from the Xactimate glossary, each with the definition an estimator needs when a claim line names it.
- Examination under oath
A formal interview, conducted under oath, where the insurer questions the policyholder about a claim. It is typically used when a carrier needs answers about the cause and details of a loss or suspects misrepresentation. The policyholder answers questions through an attorney, and the testimony can be used later. Restoration contractors prepare for it by keeping thorough records of the loss date, scope, and repair costs.
- Exclusion
A condition in an insurance policy that states what is not covered. Exclusions commonly include flood, earth movement, and gradual wear and tear. When a claim is denied because of an exclusion, the contractor or policyholder should confirm the policy wording, because coverage for certain losses can be added through an endorsement. Understanding the exclusions helps set expectations about which repair work an estimate will cover.
- Felt paper
A traditional roofing underlayment made from asphalt-saturated paper, installed on the roof deck beneath the shingles. It adds a secondary water barrier and protects the deck before and during installation. Roofers may use one or more layers of felt depending on the roof pitch and local practice, and the quantity is measured as part of the roof system. Synthetic underlayment is now common, but felt paper still appears on many estimates.
- Field adjuster
An insurance adjuster who visits damaged properties to inspect the loss in person. The field adjuster measures the damage, takes photos, and compares the contractor's estimate against the actual conditions at the site. After the inspection, the adjuster approves a scope or discusses changes. Because the field adjuster sees the property directly, the estimate and supporting documentation the contractor prepares are what determine the final payment.
- Fire damage
Damage caused by fire, smoke, and heat to a structure and its contents. Fire losses often affect multiple systems: charred framing may need replacement, soot coats walls and surfaces, and odor soaks into materials. Restoration of fire damage runs from emergency board-up and debris removal through smoke cleaning and structural repair, and the estimate documents each step separately so the adjuster can review the full scope.
- Fire restoration
The process of repairing a structure and its contents after a fire loss. The work typically begins with emergency services such as board-up and debris removal, then continues with soot and smoke cleaning, odor control, and replacement of damaged materials. Every step is written into the estimate with line items that distinguish cleaning and repair from replacement, so the adjuster can see exactly what the contractor did and why.
Common questions
What does "F9 notes" mean in Xactimate estimating?
Xactimate estimating defines F9 notes this way: Notes attached to a line item in Xactimate: F9 opens the notes field. They document why an item is included, which is often the difference between an approved item and a denied one.
Where does "F9 notes" show up in a claim?
The term matters on estimates and scopes across the insurance restoration workflow, see the full guide for where it fits.
Put this to work
ESXPress converts carrier scope PDFs into import-ready Xactimate ESX files with a known catalogue mapping where it resolves, and carries a recorded price amount where present.
Start free, 5 conversions, no card →