How to Reconcile Two Claim Estimates: Step by Step

By Chaz Jaco, Co-Founder & Software Architect, ESXPress - Last updated:

Reconciling two claim estimates means matching them line by line on code, quantity, activity and unit price, then resolving every difference against evidence rather than preference. Xactimate can compare saved versions of the same estimate for you, but it does not align two independently built estimates, so the work is manual and the discipline is in the order you do it: quantities before prices, add-ons last.

Reconciliation is not an argument about who is right, and it is not a hunt for the largest number. It is the process of proving, line by line, that two documents describe the same work, or of recording precisely where they diverge and what evidence settles it.

That framing matters because it produces a different document. An argument produces a position. A reconciliation produces a table in which every difference has a cause and an evidence source, and in which the lines that agree are shown to agree. The second is the document that survives a review, a phone call and a second reviewer who was not in the room.

It also means the reconciliation can conclude that the other estimate is right. If the evidence supports the other file on a line, say so on that line and move on. Credibility is spent unevenly across a document, and a reconciliation that never concedes anything reads as advocacy.

What Xactimate will compare for you

Xactimate has real comparison machinery, and it is worth knowing exactly what each piece does before you rely on it, because the most common mistake in this work is assuming the software has already done a comparison it never does.

The Change report is a detailed report that compares the differences between saved versions of the estimate, focusing on item additions, edits and deletions. The Contents change report is available only if a previously closed version of the estimate exists, so it compares against something that was finalised. The Differences report shows category detail summaries and a comparison of add-ons. The Scope report gives a room by room scope with no price information at all.

Read that list again and notice the boundary. Every one of those reports compares versions of one project, or summarises one project. None of them takes a carrier estimate and a contractor estimate written by different people in different systems and lines them up. If the two documents came from different sources, the comparison is yours to build. That is why the method below starts with normalising the files rather than with a report.

There is one consolidation feature that helps: Project Merge merges multiple projects into a single project. That is useful when you want one working file that holds both scopes in separate groups, which makes a manual alignment much easier to keep track of. It is not a diff, and merging does not tell you which lines correspond.

Step 1: get both documents into a comparable form

You cannot reconcile a PDF against an .esx, and you cannot reconcile two PDFs with any confidence. You need both sets of lines as data: code, quantity, unit, activity and price, per line.

That usually means converting the carrier or contractor PDF into an .esx so both files open in Xactimate and both can be inspected the same way. The conversion is not a neutral step, so be explicit about what you are doing: lines are rebuilt from the printed descriptions, mapped to catalogue codes, and anything that cannot be grounded is flagged rather than guessed. The converted file is an aid to comparison, not a substitute for the original document, and the original stays attached to the review.

Record three facts before you compare anything: which price list each file was built on, which price month, and which property measurements each used. Two of those three are invisible in a PDF, and they explain most price differences before you have looked at a single line.

Step 2: match lines by code, not by description

Descriptions are free text, so the same work can be described five ways and two different jobs can share a description. The code is the stable key. Build the comparison on the category code plus selector code, and treat the description as supporting information rather than as the identifier.

Where a line has no code, it cannot be matched by code, and that is a finding in itself. Put those lines in their own column and resolve them by reading the description and deciding what work it represents. If you want a fast way to check what a code means and which unit it is priced in, the code lookup covers the whole catalogue, and the line item search guide shows how to find a code when you only know the work.

Matching by code has a second benefit: it exposes code differences that look like scope differences. Two files can carry the same work under different selectors, and a naive description match will report that as one missing line and one extra line. Matching by code turns that into a single question with a single answer.

Step 3: classify every difference into one of seven kinds

A difference that is not classified cannot be resolved, because different kinds of difference need different evidence. These seven cover almost everything you will find, and each one has a test and an evidence source.

KindThe testEvidence that settles it
Missing lineOne estimate has work the other does not carry at all.A photograph, a measurement, or a scope note. Never the other estimate.
Extra lineOne estimate carries work the damage does not support.The loss report, the photographs, or the policy's coverage basis.
Quantity differenceThe same code appears in both files at different quantities.The sketch or the measurement sheet, not the higher of the two numbers.
Activity differenceThe same code, same quantity, different activity (installation against tear-out, for example).The work the crew has to do, itemised room by room.
Code differenceTwo codes for what may be the same work, or one file using a custom code.The catalogue definition of each code and its unit of measure.
Price differenceThe same code, same quantity, different unit price.The price list identity: which region and which price month each file used.
Add-on differenceOverhead and profit, depreciation, or a code item present in one file and not the other.The policy, the contract, and the estimate parameters of each file.

Two rules make this table work. First, a difference gets exactly one class. If a line is both a quantity difference and an activity difference, split it into two rows, because they are two findings with two answers. Second, the evidence column may never read "the other estimate". Using one estimate as evidence for the other is how a reconciliation becomes a negotiation.

Step 4: resolve quantities before prices

Resolve quantity differences first, and resolve them against a measurement rather than against the other file. The sketch, the measurement sheet or the room dimensions settle a quantity. The other estimate does not, however carefully it was built.

There is a practical reason for the order. A quantity difference changes what the line is, while a price difference changes what the same line costs. If you settle prices first, you will reprice lines whose quantities are still in dispute, which means redoing the work.

Where neither file has a measurement, the honest output is a finding that says so: quantity unverified, measurement requested. That is a legitimate result and it is more useful than picking the larger number and calling it agreed.

Step 5: resolve price differences on list identity

Once quantities agree, a remaining price difference on the same code is almost always a list difference. Xactimate prices from a regional price list that is updated on a monthly cycle, so the same code in the same quantity can carry a different unit price in a different region or a different price month.

That makes the question factual and answerable: which list was each file priced on. If they match, a remaining difference means one of the lines was typed over, and the line is a bid rather than a list price. If they do not match, the resolution is a reprice, not an argument, and both files should be brought onto the list for the job's region before anyone discusses the number.

This is worth stating plainly because it is where most reconciliations go wrong. People compare unit prices from two different price months and conclude that one side is overcharging. The numbers were never comparable. Our explanation of Xactimate pricing covers the regional and monthly mechanics, and the reprice on import explains what happens to a file when it lands on a different list.

Step 6: reconcile the add-ons last

Add-ons come after the lines because they are calculated on top of them. Three matter most in a two estimate reconciliation, and each one has its own question.

Overhead and profit: is it present in each file, at what level, and is that consistent with the contract being worked to? Xactimate can carry overhead and profit on an item and can also be configured at the profile level in Xactimate Admin, so the answer is not always visible from the line list alone.

Depreciation: which basis is each estimate stated on? Depreciation is the difference between an item's actual cash value and the cost to repair or replace it, and actual cash value is what the item is worth after depreciation is removed from replacement cost. Two files can both be internally correct and still look different because one is stated on replacement cost and the other on actual cash value.

Code items: Xactimate's Code Upgrade feature includes and flags items required by current local ordinances and building codes. If one file carries code items and the other does not, the reconciliation needs the jurisdiction's requirement, not an opinion about whether the roof needed them.

Step 7: run the inspection on both files

Before you write anything up, run the software's own checks on both files. Xactimate's inspection feature checks for possible problems in an estimate, and XactXpert returns alerts in three classes: violations, warnings and cautions. XactXpert Review is an optional feature that can require every user to review all alerts before an estimate is completed.

The inspection is not a completeness check and should not be presented as one. It tells you about the file: an item that usually appears with another, a coverage that is not set, a quantity outside a normal range. It cannot tell you about the building. But it is fast, it is free, and a violation found in both files is evidence that the same rule was broken twice, which is a different and sometimes more useful finding than a line level difference.

Step 8: write the reconciliation as a table plus notes

The deliverable is not a narrative. It is a table with one row per line, and a short note wherever a line needed a judgement. Five columns do the job: the code, the quantity in each file, the unit price in each file, the difference class from step three, and the evidence reference.

Keep the evidence references specific: photograph number, sketch page, measurement sheet row, policy provision. A reference someone else can open is worth more than a paragraph of explanation, and it converts a disagreement into a checkable claim.

Then write a short summary that answers three questions in order: which lines are agreed, which lines are in dispute and why, and what evidence would settle each dispute. Do not put a grand total at the top as the headline finding. A total is a summary of the lines, and leading with it invites a negotiation about the summary instead of a resolution of the lines.

Step 9: when they still disagree, change the question

Some differences do not resolve, because they are not really about the estimate. Two common ones: the two people measured different things, or they disagree about what the policy covers. Neither is settled by rereading the line items.

When the disagreement is a measurement, the answer is a joint measurement or a third measurement, not a stronger argument about the number. When the disagreement is coverage, the answer is the policy language and the jurisdiction, and the estimate should be reconciled on scope with the coverage question recorded as a separate issue.

If the outcome is a supplement, write it as a supplement rather than as a corrected copy of the other file. The supplement guide covers the structure, and the supplement workflow shows how a supplement is built and supported line by line.

Five traps are worth naming before you close the file. Each one makes a reconciliation worthless even when every number in it is correct.

  • Comparing totals first. A total can match while the lines inside it offset each other. It can also differ while every line is correct, because the price months differ.
  • Treating the other estimate as evidence. Two estimates that disagree are two claims, not one fact. Evidence lives in the property, the measurements and the policy.
  • Matching on description text. Free text drifts. The same work described two ways becomes two findings, and two different jobs described the same way disappear into one.
  • Skipping the activity field. A file can carry the right code and the right quantity with the wrong activity, and the line will look agreed while describing different work.
  • Accepting a custom code as a match. A custom item has no catalogue identity, so it cannot be matched on price or repriced. It needs a scope answer, not a code match.

A note on what ESXPress does here, and does not

ESXPress converts a carrier scope PDF or a scope XML export into an import-ready .esx, with catalogue codes on the lines and the document's own printed quantities and prices carried through. In a reconciliation that is the first step, not the answer: it gives you two files that can be inspected and repriced the same way.

It does not decide which estimate is right, it does not compare two estimates for you, and it does not tell you what a scope is missing. Those remain review judgements, made against the property and the policy. What the product does do is remove the transcription step that makes a second file expensive to produce, which is often the reason a reconciliation never happens at all.

For the file level checks either side of that work, the ESX validator confirms a file's structure, and the comparison pages set out how this product differs from the alternatives, including where it does less.

Questions people actually ask

Does Xactimate have a tool that compares two estimates?

Xactimate's Change report compares the differences between saved versions of the same estimate, and focuses on additions, edits and deletions. That is version comparison inside one project. It does not align a carrier estimate with a contractor estimate built by someone else, which is a different job and still has to be done line by line.

Which report should I use for a comparison?

The Change report if both files are saved versions of the same project. The Differences report shows category detail summaries and a comparison of add-ons, which is useful for a first pass. The Scope report is room by room with no prices, which is the right document when the argument is about scope rather than money.

Why do two estimates for the same loss never match?

Four reasons cover most of it: a different line set, different quantities, a different price list or price month, and different add-ons. Quantities and line sets differ because two people measured differently or read the damage differently. Prices differ because the lists are regional and updated monthly, so the same code legitimately carries different numbers.

Should I reconcile on totals or on lines?

On lines. A total is a summary of decisions already made, so matching totals can hide offsetting errors: one scope can be missing work and carry extra work at the same time. Reconcile each line, classify each difference, and let the totals agree or not once the lines are settled.

What do I do when the two files use different codes for the same work?

Look both codes up and compare the unit of measure and the category. If the units differ, the two lines measure different things and one of them is wrong for the job. If the units match, pick the code whose definition matches the work as documented, and say why in the reconciliation notes so the choice is reviewable.

How do I handle a custom item in one of the estimates?

A custom item carries no catalogue code, so it cannot be compared on price or repriced by the platform. Treat it as a scope question: what work does the description represent, and which catalogue code expresses that work? If no code fits, keep it and document the reason rather than forcing a code that means something else.

Where do depreciation and overhead and profit fit into a reconciliation?

They are add-ons, so reconcile them after the lines. Check which basis each file uses, because depreciation is the difference between actual cash value and replacement cost, and a file can show one and not the other. Overhead and profit can sit at item level or be set at profile level, so confirm where each file carries it.

Sources and standards cited on this page

ESXPress cites these external sources on this page, and each one supports a specific claim above: the code edition behind a requirement, or the platform documentation behind a format claim.

Report behaviour, alert classes and the definition of depreciation come from Verisk and Xactware documentation read on 21 November 2026. Price list behaviour is described on this site's Xactimate pricing page.