How to Analyze a Contractor's Estimate in Xactimate
By Chaz Jaco, Co-Founder & Software Architect, ESXPress - Last updated:
Analyze a contractor's estimate in Xactimate in five passes, in this order: the structure (rooms, levels and groups), the code on every line, the quantity against a measurement, the unit price against the job's price list, and the add-ons (activity, overhead and profit, depreciation, code items). Xactimate gives you the fields for all five; it does not tell you whether the scope is complete. That last question is answered against the source document, not inside the software.
There are three different questions in the phrase "check this estimate", and mixing them up is why the exercise often ends in an argument rather than a finding.
The first question is scope: does the file contain the work the damage requires? The second is arithmetic and identity: is each line coded, measured and priced in a way that Xactimate can defend? The third is policy and contract: is the work covered, at what basis, with what deductible and what depreciation. Only the second question lives inside Xactimate. The first is answered against photographs, measurements and the source scope. The third is answered against the policy.
A useful analysis keeps those three separate and writes down which one each finding belongs to. A line that is coded correctly but describes work that was not damaged is a scope finding, not a coding finding, and it needs different evidence.
Why the PDF is the wrong surface to analyse
A PDF is a rendering of a report template. Xactware documents several report types and they do not carry the same content: the scope report gives a room by room scope with no price information at all, while the rough draft report covers item quantities, prices, summaries and recaps. Which fields you see depends on the template the author chose, so two PDFs of the same estimate can look like different documents.
What a PDF cannot give you is the working file: the group tree, the code on each line, the activity, the price list identity and the altered lines. Those are properties of the estimate, not of its printout. This is the argument in the PDF is not the estimate, and it is why the first practical step in a real review is to get the file, not the printout.
If the file does not exist, or the contractor will not send it, converting the PDF is the next best thing. The conversion rebuilds the line items into an .esx so that codes, units and quantities become inspectable, and anything the converter cannot ground is flagged rather than guessed. That is exactly what PDF to Xactimate does, and the result opens in your own licensed copy of Xactimate.
The five passes, in order
The order matters because each pass makes the next one cheaper. Structure tells you where to look. Codes tell you whether a line is checkable at all. Quantities and prices tell you whether the checkable lines are right. Add-ons tell you what the file is doing on top of the lines.
Pass 1: Structure before lines
A group tree tells you what the estimator thought the building was. Rooms, levels and groups are how Xactimate organises an estimate, so a single flat list on a two storey loss is a warning that the person who built the file was not modelling the property. Count the rooms against the loss report before you read a single line.
Pass 2: The code, not the description
Every line carries a category code, a selector code, an activity, a description, a calculation, a unit price and a unit of measure. The description is free text and can say anything. The code is what Xactimate prices, so the code is what you check. A line with a plausible description and no catalogue code is an unpriced opinion.
Pass 3: Quantity against a measurement
A quantity is only defensible against a measurement: roof area, wall area, linear feet of ridge, room dimensions. If the estimate has no sketch and no measurement sheet, a quantity is a guess with a decimal point. Compare the largest quantities first, because that is where a rounding habit becomes a real difference.
Pass 4: Unit price against the price list
Xactimate resolves prices from the price list loaded for the job's region and price month. If a line carries a price the list does not support, either the line was typed by hand or the file came from a different list. Ask which list, and which month, before you argue about the number.
Pass 5: Add-ons and the items that are missing
Activity, overhead and profit, depreciation and code required items are where estimates differ most between two people looking at the same damage. Check each one deliberately rather than assuming the software handled it.
Pass one in detail: reading the structure
In Xactimate an estimate is a tree. The top is the project, then rooms and areas, then groups inside them, then line items. The tree is not decoration: it is how the estimator kept track of which quantity belonged to which surface. A file built properly has a room for the kitchen, a group for the ceiling, a group for the walls, and quantities that came from the sketch.
When you open someone else's estimate, look for three things in the tree before anything else. Are the rooms the rooms that were damaged? Are there levels, on a property that has levels? And are the groups organised by trade or by surface, rather than one long list labelled "general"?
A flat file is not automatically wrong. Small losses are often flat, and a garage rebuild can legitimately be eight lines. But on a multi room loss, a flat file means the quantities were typed rather than derived, and that changes how much weight the rest of the review can carry.
Pass two: what the code tells you that the description hides
Every Xactimate line carries a category code and a selector code, and together they are what the price list prices. The description is text the estimator can edit. That asymmetry is the single most useful fact in estimate review: a description can be edited to say anything, while the code still points at what the line actually is.
So read the code first and the description second. The code gives you the category (roofing, drywall, plumbing, painting and so on), the specific item inside it, and the unit of measure the item is priced in. If the unit cannot express the work described, you have found a mismatch without needing the price list at all. Our code lookup shows category, unit and category name for any code, free, and the line item search guide explains how to search by trade rather than by guessing wording.
Two code states deserve special attention. A line with no code at all cannot be priced from the catalogue, so Xactimate will carry whatever number the file holds. And a line in the USR category, which Verisk's category list names "user-defined items", is a custom item: it may be perfectly reasonable work, but it has no catalogue identity to check against.
Pass three: activity, the field people skip
Activity is the field that says which version of the work a line represents. Verisk's own price list description says that where it applies, unit costs include several possible activities, including installation, tear-out, and detaching and resetting an item. Those are three different jobs with three different labour components, and they are priced differently.
This is where a scope can look complete and still be understated. Ten squares of tear-off and ten squares of installation are both "roofing", and a file that carries only the installation activity has told you about half the work while showing you the right quantity. Check the activity on the largest lines first; it is the cheapest high value check in the whole review.
Pass four: quantities need a measurement, not a defence
A quantity without a measurement is an assertion. The honest way to review quantities is to ask what they were measured from, and then check a sample against that source. On a roof, the source is the sketch: pitch, facets, ridges, hips, valleys, eaves and rakes. On an interior, it is room dimensions and ceiling height. On a water loss, it is affected area by material and drying days.
Sample rather than exhaust. Take the five largest quantities by category, check each against the measurement, and note the direction and size of any gap. If the five are sound, the rest of the file probably came from the same source. If two of the five are not, stop sampling and rebuild the measurement, because the file is not derived from one.
Round numbers are a useful tell. Real measurements produce awkward figures. A file where every quantity ends in zero was estimated by eye, and the review should say so plainly rather than pretending the numbers are measurements.
Pass five: unit prices and the price list question
Xactimate prices from a price list selected for the job's region, and lists are updated on a monthly cycle. That means a unit price is only meaningful with two pieces of context: which list, and which price month. Without them, comparing two numbers is comparing two different rulers.
When a price looks wrong, the question is not "is this too high" but "where did this number come from". Three answers are possible. It came from the list, in which case it is the region's rate. It came from a different list, in which case the file needs to be repriced against the right one. Or it was typed over, in which case the line is a bid dressed as a catalogue item.
The reprice on import usually settles the first two. Xactimate applies the list loaded on the machine when the file is imported, and reports what moved. That behaviour is covered in why Xactimate reprices an estimate, and it is also why a converted file that carried the document's printed prices will look different after import.
Add-ons: overhead, profit, depreciation and code items
Four add-ons change the file without changing a single quantity, which is why they are so often the real difference between two estimates.
Overhead and profit can be applied to an item and is also configured at the profile level in Xactimate Admin. Whether a file carries it, and where, is a property of the estimate you are reading, not an assumption you can make from the line items alone.
Depreciation is the difference between an item's actual cash value and the cost to repair or replace it. Actual cash value is what the item is worth after depreciation is removed from replacement cost. A file can legitimately show one basis and not the other, so state which basis you are reviewing before you call something missing.
Code items are the fourth. Xactimate has a Code Upgrade feature that lets an estimator include and flag items required to repair a structure as required by current local ordinances and building codes. A code item is therefore visible as a flag in the file, and its absence on an older roof is worth a question. The code upgrade supplement guide covers what that conversation looks like.
Let the software flag what it can see
Xactimate has an inspection feature that checks for possible problems in an estimate, and XactXpert returns alerts in three classes: violations, warnings and cautions. XactXpert Review is an optional feature that a profile or instance owner can switch on to require every user to review all alerts before an estimate is completed.
Read the alerts, but read them for what they are. They are rules about the file: a missing coverage, a quantity outside a norm, an item that usually appears with another. They are not a judgement about the property. A file can pass inspection and still miss half a roof, because the software has no photograph of the roof.
This is the same distinction that governs conversion. Our Completeness Advisor runs completeness checks against cited IRC and IICRC references, and it is deliberately a separate layer from the code check, because "this line is coded correctly" and "this scope is complete" are two different claims.
Six red flags worth writing down
| What you see | Why it matters |
|---|---|
| A line with no category and selector | Nothing in the price list can price it, so Xactimate cannot reprice it and you cannot check it. It will sit in the file at whatever number was typed. |
| The user-defined category (USR) | Verisk's category list names USR as user-defined items. A user-defined line is a custom item: legitimate sometimes, but it is not a catalogue code, so it carries no list identity. |
| A lump sum line standing in for measured work | A bid item or an allowance prices an outcome instead of a quantity. It is unmeasurable by construction, so it cannot be reconciled against the scope. |
| A price that does not move when the price list changes | Built-up or manually typed prices survive a reprice. If the number stayed identical across two price months, it is probably not coming from the list. |
| Quantities in round numbers throughout | Real measurements produce odd numbers. A file where every quantity is a round figure was estimated, not measured. |
| No sketch on a roof or multi-room loss | The sketch is where quantities come from in Xactimate. Without it, the quantities have no provenance. |
Writing the review so it survives a phone call
A review that says "the estimate looks low" is not usable. A review that says which line, which field, what the source says and what the file says is usable, because the other side can check it without taking your word for anything.
Use one row per finding and four columns: the line identifier, the field in question (code, quantity, activity, price or add-on), the evidence from the source document, and the change you are asking for. Keep arithmetic out of the argument. The per line values are the conversation; a grand total is a summary of decisions already made, not an argument of its own.
Notes matter here. Xactimate carries line item notes, and the trade convention of an F9 note exists precisely because a line with a justification attached is harder to remove than a line without one. Our guide to F9 notes explains the convention and how it is used in supplements.
Where the software stops and the reviewer starts
Xactimate is very good at three things: holding a structure, pricing a coded line from a regional list, and flagging rule violations. It is not able to tell you whether the scope matches the damage, because it has never seen the damage. That work is the reviewer's, and it is the part that decides whether the estimate is right.
The practical consequence is that the most valuable hour in a review is usually spent with the photographs and the measurements, not in the software. The software is where you confirm what you found. If you want a second pair of eyes on the completeness question before you start, the scope audit checks a carrier roof scope for the items these documents commonly leave out, and the Xactimate comparison page sets out what the platform does and does not do, without a sales gloss.
Questions people actually ask
Can Xactimate open a contractor's PDF estimate?
No. Xactimate opens its own project file, an .esx. A PDF has to be converted first, and the conversion is what turns printed descriptions into code-carrying lines. Without that step you can read the PDF, but you cannot check its codes, repricing behaviour or structure inside Xactimate.
What is the first thing to check on someone else's estimate?
The group structure. Rooms, levels and groups tell you whether the estimator modelled the building or typed a list. A flat file on a multi-room loss is the fastest signal that quantities were not derived from a sketch, which makes every quantity downstream of it worth less.
How do I know if a line item code is the right one?
Look the code up and read what it is for, then compare that to the printed description. Xactimate's own category and selector naming carries a lot of the answer, and a free code lookup shows the category, the unit of measure and the category name. A unit that cannot express the work is the giveaway.
Why do two estimates for the same damage differ so much?
Usually for four reasons: a different set of line items, different quantities, a different price list or price month, and different add-ons such as overhead and profit or depreciation. Price is rarely the biggest of the four. Scope and quantity differences are, and they are the ones a line by line comparison exposes.
What does depreciation have to do with reading an estimate?
Depreciation is the difference between an item's actual cash value and the cost to repair or replace it, and actual cash value is what the item is worth after depreciation is removed from replacement cost. A file that carries replacement cost without depreciation is telling you about one number and not the other, so check which basis you are reading.
Does Xactimate check the estimate for mistakes?
It flags the ones it can see. Xactimate's inspection feature checks for possible problems in an estimate, and XactXpert returns alerts in three classes: violations, warnings and cautions. Those are rules about the file, not about the property, so a clean inspection does not mean the scope is complete.
How long should analysing an estimate take?
We have no measured figure and will not invent one. The work scales with line count, not page count, and the structural pass is the fastest way to find where the time will go. A file with a sketch and groups can be checked against measurements; a flat file has to be rebuilt to be checked at all.
Sources and standards cited on this page
ESXPress cites these external sources on this page, and each one supports a specific claim above: the code edition behind a requirement, or the platform documentation behind a format claim.
- Verisk, Xactimate User Certification (PDF): the line item fields Verisk examines
- Verisk, Xactimate Platform Comparison (PDF): price list activities, Code Upgrade, Inspection
- Xactware help, Which report do I need?
- Xactware help, XactXpert Review
- Xactware help, Depreciation in Xactimate mobile
Field names, report contents, activity types and the definition of depreciation are taken from Verisk and Xactware documentation read on 21 November 2026.