Skip to content
Sign In

Codes for Water Damage Mitigation

The first 48 hours decide a water-loss claim. Extraction goes in before the dryers, and the antimicrobial treatment goes on before the walls close back up. This bundle covers that mitigation side — the lines that run between the leak and the rebuild.

The codes in this scope

  • WTR|WTRACTWater & Damp Proofing
  • WTR|WTRACT3Water & Damp Proofing
  • WTR|WTRACT3AWater & Damp Proofing
  • WTR|WTRACT3NWater & Damp Proofing
  • WTR|WTRACT3NAWater & Damp Proofing
  • WTR|WTRACTAWater & Damp Proofing
  • WTR|WTRACTASWater & Damp Proofing
  • WTR|WTRACTAS3Water & Damp Proofing
  • WTR|WTRACTAS3AWater & Damp Proofing
  • WTR|WTRACTASAWater & Damp Proofing
  • WTR|WTRACTASNWater & Damp Proofing
  • WTR|WTRACTASNAWater & Damp Proofing
  • WTR|WTRACTNWater & Damp Proofing
  • WTR|WTRACTNAWater & Damp Proofing
  • WTR|WTRACTSWater & Damp Proofing
  • WTR|WTRACTS3NWater & Damp Proofing
  • WTR|WTRACTS3NAWater & Damp Proofing
  • WTR|WTRACTSAWater & Damp Proofing
  • WTR|WTRACTSNWater & Damp Proofing
  • WTR|WTRACTSNAWater & Damp Proofing
  • WTR|WTRACTSSWater & Damp Proofing
  • WTR|WTRACTSSAWater & Damp Proofing
  • WTR|WTRACTSSNWater & Damp Proofing
  • WTR|WTRACTSSNAWater & Damp Proofing
  • WTR|WTRAGPWater & Damp Proofing
  • WTR|WTRBAGWater & Damp Proofing
  • WTR|WTRBARRWater & Damp Proofing
  • WTR|WTRBARRAWater & Damp Proofing

Codes in grey are in the reference but have not yet appeared in enough processed claim scopes to carry their own measured page. They still belong to this scope.

Common questions

Are drying-equipment lines real line items?

Yes — dehumidifiers, air movers and extraction equipment price by the day and show up as their own lines in mitigation scopes.

What does the antimicrobial line cover?

Application of an antimicrobial agent to surfaces after water damage. It's a standard mitigation line and it's one of the most-common codes in water-loss scopes.

Should I use the water-damage or roofing category for a leak?

Leak at the roof = both. The roofing lines fix the source; the water-damage lines handle what happened inside.

Want these lines in a real estimate? Read the deeper guide or convert a carrier scope PDF to an import-ready ESX file.

Put these codes to work: supplement a mitigation scope.

Convert a scope PDF to an import-ready ESX file

Every line mapped to its correct Xactimate SEL code — accurate, code-matched, and ready for Xactimate.

Xactimate is a registered trademark of Verisk Analytics. ESXPress is an independent tool and is not affiliated with or endorsed by Verisk. Built by Chaz Jaco.