#DescriptionSectionQtyUnitTotal
1Tear off, haul and dispose of comp. shingles - LaminatedRoof31.23$87.59$2,735.44
2Laminated - comp. shingle rfg. - w/out felt 17/30 yrs Avg. 56.67% Component RFG300 from this line item was priced by ITEL Asphalt Shingle Pricing (ASP) on 8 Sep 2025. Auto Calculated Waste: 5.7%, 1.77SQRoof33$235.96$7,786.68
3Roofing felt - 15 lb. 17/20 yrs Avg. 80.00%Roof31.23$32.14$1,003.73
4Asphalt starter - universal starter course 17/20 yrs Avg. 80.00%Roof318.38$1.68$534.88
5Hip / Ridge cap - Standard profile - composition shingles 17/30 yrs Avg. 56.67%Roof110.93$6.00$665.58
6Drip edge 17/35 yrs Avg. 48.57%Roof318.38$2.60$827.79
7Roof vent - turtle type - Metal 20/35 yrs Avg. 57.14%Roof3$62.16$186.48
8Continuous ridge vent - shingle-over style 20/35 yrs Avg. 57.14%Roof96.71$9.28$897.47
9Rain cap - 6"Roof1$0.00
11Detach & Reset Skylight - reflective tube - 10"Roof5$404.36$2,021.80
12Detach & Reset Skylight - reflective tube - 8" *** Begin Revision Reggie Francis (vah7wi) 10/14/2025***Roof3$404.36$1,213.08
13Flashing - pipe jack 20/35 yrs Avg. 57.14%Roof2$45.18$90.36
14Add. layer of comp. shingles, remove & disp. - 3 tabRoof31.23$53.68$1,676.43
15R&R Exhaust cap - through roof - 6" to 8" 15/35 yrs Avg. 42.86%Roof1$110.98$110.98
17R&R Skylight flashing kit - dome - Large 20/15 yrs Avg. 80.00%Roof2$158.51$317.02
18Remove Additional charge for high roof (2 stories or greater)Roof23.43$8.04$188.38
19Additional charge for high roof (2 stories or greater) Totals: Roof Area Totals: Exterior 3,317.06 SF Walls 375.33 Exterior Perimeter 3,317.06 SF Walls and CeilingRoof23.43$17.71$414.95
20R&R Window screen, 1 - 9 SF 10/30 yrs Avg. 33.33%Front Elevation4$55.87$223.48
21R&R Overhead door & hardware - 8' x 7' 10/35 yrs Avg. 28.57%Front Elevation2$1,545.66$3,091.32
22R&R Light fixture - Standard gradeFront Elevation1$0.00
23R&R Soffit - vinylFront Elevation20$6.18$123.60
24Siding - aluminum/steel - per independent material sourceFront Elevation214.4$0.00
25House wrap (air/moisture barrier)Front Elevation214.4$0.00
26R&R Metal J trim 20/50 yrs Avg. 40.00% *** Begin Revision Reggie Francis (vah7wi) 09/27/2025***Front Elevation50$5.52$276.00
27R&R Siding - steel (29 gauge) 20/150 yrs Avg. 13.33%Front Elevation215$9.95$2,139.25
28R&R Fanfold foam insulation board - 1/4" 20/150 yrs Avg. 13.33%Front Elevation215$0.90$193.50
29R&R Exterior light fixture 20/20 yrs Avg. 80.00%Front Elevation1$129.92$129.92
30R&R Fascia - fiber cement - 6" 20/150 yrs Avg. 13.33% Totals: Front Elevation Right ElevationFront Elevation57$8.31$473.67
31R&R Siding - steel (29 gauge) 20/150 yrs Avg. 13.33%Right Elevation587$9.95$5,840.65
32R&R Fanfold foam insulation board - 1/4" 20/150 yrs Avg. 13.33%Right Elevation587$0.90$528.30
33Detach & Reset Exterior faucet / hose bibbRight Elevation1$95.21$95.21
34R&R Attic vent - gable end - vinyl - Small - Standard grade 20/27 yrs Avg. 74.07%Right Elevation1$97.79$97.79
35Clothes dryer vent cover - Detach & reset Totals: Right Elevation Rear Elevation 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls & CeilingRight Elevation1$29.53$29.53
36R&R Gutter / downspout - aluminum - up to 5" 10/25 yrs Avg. 40.00%Rear Elevation16$9.68$154.88
37R&R Window screen, 1 - 9 SF 10/30 yrs Avg. 33.33% *** Begin Revision Reggie Francis (vah7wi) 09/27/2025***Rear Elevation1$55.87$55.87
38R&R Siding - steel (29 gauge) 20/150 yrs Avg. 13.33%Rear Elevation1,004$9.95$9,989.80
39R&R Fanfold foam insulation board - 1/4" 20/150 yrs Avg. 13.33%Rear Elevation1,004$0.90$903.60
40Detach & Reset Disconnect box - 30 amp - non fusedRear Elevation1$95.21$95.21
42R&R Attic vent - gable end - vinyl - Small 20/27 yrs Avg. 74.07%Rear Elevation1$115.56$115.56
43Detach & Reset Spot light fixture - doubleRear Elevation1$105.57$105.57
44Siding - General Laborer - per hour additional labor access to high and uneven surfaces Totals: Rear Elevation Left Elevation 0.00 SF Walls 0.00 SF CeilingRear Elevation2$59.79$119.58
45R&R Gutter / downspout - aluminum - up to 5" 10/25 yrs Avg. 40.00% Above is for replacement of storm damaged downspoutLeft Elevation30$9.68$290.40
46Siding - aluminum/steel - per independent material sourceLeft Elevation671.4$0.00
47House wrap (air/moisture barrier)Left Elevation671.4$0.00
48R&R Gutter splash guard 12/20 yrs Avg. 60.00% *** Begin Revision Reggie Francis (vah7wi) 09/27/2025***Left Elevation39.17$23.00$900.91
49R&R Siding - steel (29 gauge) 20/150 yrs Avg. 13.33%Left Elevation634$9.95$6,308.30
50R&R Fanfold foam insulation board - 1/4" 20/150 yrs Avg. 13.33%Left Elevation634$0.90$570.60
51Detach & Reset Shutters - simulated wood (polystyrene) - SmallLeft Elevation1$35.20$35.20
52Low voltage box - Detach & resetLeft Elevation1$33.00$33.00
53R&R Gutter guard/screen - Premium grade 10/20 yrs Avg. 50.00% Totals: Left Elevation GuttersLeft Elevation39$20.69$806.91
54R&R Gutter / downspout - aluminum - up to 5" 15/25 yrs Avg. 60.00% Totals: Gutters Debris RemovalGutters129.42$9.68$1,252.79
55Dumpster load - Approx. 12 yards, 1-3 tons of debrisDebris Removal - Interior1$0.00
56Dumpster load - Approx. 20 yards, 4 tons of debris Totals: Debris Removal Area Totals: Source - EagleView Roof & WallsDebris Removal - Interior1$534.49$534.49
57Electrical labor minimumLabor Minimum Applied1$77.05$77.05
55Roofing (Bid Item)Roof2$0.00
56Roofing (Bid Item)Roof2$295.08$590.16
57Roofing (Bid Item)Rear Elevation1$61.61$61.61
58Roofing (Bid Item)Labor Minimum Applied1$211.62$211.62

By section

  • Roof19 lines$21,261.21
  • Rear Elevation9 lines$11,601.68
  • Left Elevation9 lines$8,945.32
  • Front Elevation11 lines$6,650.74
  • Right Elevation5 lines$6,591.48
  • Gutters1 lines$1,252.79
  • Debris Removal - Interior2 lines$534.49
  • Labor Minimum Applied2 lines$288.67

Codes used

  • INS/RBD1/44 lines
  • RFG/BIDITM4 lines
  • SDG/MTLCS4 lines
  • SFG/GUTA>4 lines
  • DOR/X8RS2 lines
  • INS/HWRAP2 lines
  • SDG/NSPMTL2 lines
  • SFG/VENT2 lines
  • WDA/P402 lines
  • DMO/DUMP<1 line
  • DOR/OHOKP1 line
  • ELE/MN1 line

What this means

This scope had 58 line items worth $57,989.75 in replacement cost value. ESXPress turned the PDF into a finished, catalog-priced .esx file in 1 min 10 sec — hand-keying a scope like this typically takes hours.

Accuracy: the automated import checks passed, with notes — small price drift or lines flagged for review. Nothing was silently guessed. 100% of lines resolved to a catalog code.

All identifying details — company names, addresses, claim and policy numbers, contacts — are removed from case studies.

See what your scope would look like

Start free — no card required, 5 free conversions included. First conversion in about two minutes.

Case Study: 58-line scope, $57,989.75 RCV — ESXPress